Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results.


Results 11-20 of 38 (Search time: 0.002 seconds).
Item hits:
Issue DateTitleAuthor(s)
1-Oct-2009Decision analysis on generation capacity of a wind parkC. Kongnam; S. Nuchprayoon; S. Premrudeepreechacharn; S. Uatrongjit
27-Aug-2009Evaluation of switching overvoltage in 500 kV transmission line interconnection Nam Theun 2 power plant to Roi Et 2 substationT. Keokhoungning; S. Premrudeepreechacharn; K. Ngamsanroaj
27-Aug-2009Investigation of single phase reclosing using arc model on the 500 kV transmission line from Mae Moh to Tha Ta KoK. Ngamsanroaj; S. Premrudeepreechacharn
27-Aug-2009Effect of votage variation from distributed generation on very long distribution line with multiple voltage regulatorsS. Kongtripop; T. Kasirawat; C. Pongsriwat; S. Premrudeepreechacharn
1-Dec-2009Impacts of photovoltaic power generation on very long distribution lineR. Parameechok; S. Premrudeepreechacharn; T. Kasirawat
7-Aug-2017Development of wide area protection for electrical distribution system in Vientiane CapitalA. Philavong; S. Premrudeepreechacharn; K. Ngamsanroaj
7-Aug-2017Generation planning for improving reliability of power system in north and central 1 region of Lao PDRK. Somboukhanh; S. Premrudeepreechacharn; K. Ngamsanroaj
7-Aug-2017Reliability Centered Maintenance for electrical distribution system of Phontong substation in Vientiane CapitalO. Vilayphonh; S. Premrudeepreechacharn; K. Ngamsanroaj
1-Dec-2006State estimation of power system with UPFC using interior point WLAV methodC. Rakpenthai; S. Premrudeepreechacharn; S. Uatrongjit; N. R. Watson
1-Dec-2008Simulation Study of the Secondary Arc Extinction due to Single Line to Ground Fault on the Thailand 500 kV Line from Mae Moh to Tha Ta KoK. Ngamsanroaj; S. Premrudeepreechacharn; S. Chimklai