Please use this identifier to cite or link to this item: http://cmuir.cmu.ac.th/jspui/handle/6653943832/62208
Title: Surface and subsurface ground deformation due to EPB tunneling in Bangkok subsoils
Authors: D. Luangpitakchumpol
W. Teparaksa
W. Pitaksaithong
C. Boonsong
J. Boonard
Authors: D. Luangpitakchumpol
W. Teparaksa
W. Pitaksaithong
C. Boonsong
J. Boonard
Keywords: Engineering;Social Sciences
Issue Date: 1-Dec-2005
Abstract: The Premprachakorn flood diversion tunnel (OD = 4.05 m.) first shortcut tunnel of the Bangkok Metropolitan Administration (BMA) to divert the flood water in the city to the Choa Phraya river. The MRT subway tunnel (OD = 6.3 m.) of Bangkok city just opened in 2004 consists of dual tunnel for 20 km. long. Both tunnels seated in the very stiff sillty clay layer with some alternated with dense sillty sand layer between 15-24m. depths below ground surface. The empirical approaches for prediction ground surface settlement base on Peck (1969) and O'Reilly & New (1982) was presented. Based on subsurface ground response due to shield tunneling of two tunnel projects, newly developed correlation for prediction subsurface settlement is presented in terms of tunnel radius and tunnel depth. © 2005 Taylor & Francis Group.
URI: https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84856870102&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/62208
Appears in Collections:CMUL: Journal Articles

Files in This Item:
There are no files associated with this item.


Items in CMUIR are protected by copyright, with all rights reserved, unless otherwise indicated.